I Missed the Deadline—Now What?
If your system fails after 1/1/2026, you still have options
First: don’t panic. HB23-1161 is mainly about new replacement equipment being compliant after January 1, 2026—not about fining homeowners or forcing instant upgrades. The key is moving quickly through the right steps.
Reassurance: what the rule actually changes in a replacement scenario
If your furnace or water heater fails after 2026, the main difference is:
- your replacement choices may be more limited to models that meet updated emissions requirements
- availability and lead times may vary more than you’re used to
Step-by-step action plan
1) Confirm failure and safety
- If you smell gas, see soot, or suspect carbon monoxide risk: treat it as urgent.
- Get a professional diagnostic so you don’t replace something unnecessarily.
2) Define your priority: speed, cost, efficiency, comfort
Different equipment paths optimize different goals. Decide what matters most today.
3) Choose a path: compliant gas vs. electrification options
- Compliant gas replacement (when you want “like-for-like” gas comfort)
- Heat pump / hybrid options (when you want efficiency and future flexibility)
4) Check constraints fast (this saves days)
A quick pre-check can prevent delays:
- venting and combustion air (gas systems)
- electrical panel capacity and available circuits (heat pump / HPWH)
- physical space (clearances and footprint)
5) Identify rebates/financing early
Some programs require:
- specific documentation
- model eligibility
- timing rules
Getting this in motion early helps avoid missed savings.
Common misconceptions
“I can’t buy gas equipment anymore.”
Not necessarily. The key is that new equipment sold/leased after 1/1/2026 must meet the emissions standard.
“Homeowners will be fined.”
HB23-1161 is structured around manufacturing/distribution/sales/lease compliance for new products—homeowners aren’t the primary enforcement target.
“I’ll just buy something online and have it installed.”
That can create headaches:
- wrong sizing/fit
- warranty limitations
- compliance and permitting issues
A proper diagnostic and matched system matters.
Get priority help and a clear plan
If you’re facing a breakdown or worried you’re cutting it close:
- Schedule same-day/priority diagnostic
- Get a replacement planning consult with options aligned to your timeline and budget
Ready to plan without stress?
Call Welzig: (720) 336-3777 or use our contact page to schedule.
Quick reminder: This blog is general info, not legal advice


